Civil Engineering Consultants Logo

770 977-5747

info@cecincga.com

42-Inch Pilgrim Mill Road Raw Water Main

42-Inch Pilgrim Mill Road Raw Water Main 42-Inch Pilgrim Mill Road Raw Water Main

The 42-Inch Pilgrim Mill Road Raw Water Main has been installed as part of a road widening project and is combining two 16-inch and one 30-inch raw water main into one main. The new main will increase the hydraulic capacity of the City's intake to 40 MGD. Project also includes a 12-inch potable water main.