Troublesome Creek Influent Wastewater Pump Station PDF Print E-mail

The Troublesome Creek Influent Pump Station serves the Sun City Peachtree Development plus will serve future adjacent development.

The initial phase of the Troublesome Pump Station includes two 130-HP Flygt Model CP-3300 submersible pumps. The pump station will ultimately be a triplex station with the installation of one additional 133-HP pump. GA Industries Checktronics Check Valves were installed to reduce pump shutdown surges. A 275 kW standby generator provides continuous operation during power failures. The 12-foot diameter wet well provides substantial storage for the ultimate flow requirement.

The pump station was constructed by Southern Champion at a cost of $872,000.