Civil Engineering Consultants Logo

770 977-5747

info@cecincga.com

Water Transmission Projects

The Castleberry Road Water Main project includes 7,100 LF of 18” DIP, 2,400 LF of 16” DIP, 3,100 LF of 12” DIP for the City of Cumming.
The 42-Inch Pilgrim Mill Raw Water Main includes approximately 8,500 LF of pipe and 350-LF of 54-Inch cased bores.
The 20,000 LF 36-Inch Westside Water Transmission Main will supply the 2.0 MG Water Storage Tank adjacent to GA 400.